- A redesign takes about 3 to 5 weeks for a site of up to 5 pages and 6 weeks or more for a larger one.
- At Kookies a website starts at $2,500 and a large site at $3,000. A landing page is $500.
- Time depends more on feedback speed and content than on design or code.
- Protect your search traffic: plan redirects, keep good content and test before launch.
- Decide the goal first. A redesign without a goal is a facelift.
The short answer
A redesign of a small site usually takes 3 to 5 weeks. A larger one takes 6 weeks or more. At Kookies, a website of up to 5 pages starts at $2,500 and a larger site starts at $3,000. Both prices are fixed before we start.
The biggest cause of delay is rarely design. It is waiting for copy, images and feedback. If you are redesigning on Webflow, our redesign checklist covers the details.
Start with the goal
Why redesign? "It looks old" is a fair reason, but it is not a goal. Better goals sound like: get more demo requests, explain the product more clearly, load faster on phones, or let the team edit pages without a developer. A clear goal decides what to keep, what to cut and how to judge the result.
What a redesign costs with us
- Landing page, $500. One page. About a week.
- Website, from $2,500. Up to 5 pages with CMS and blog. About 3 to 5 weeks.
- Large site, from $3,000. No page limit, with custom features and migrations. 6 weeks or more.
If you only need design, website design starts at $1,500. First-time clients get $500 off projects of $2,000 or more. See the pricing page for the rest.
The phases and how long each takes
These are typical for a small site. Larger sites stretch each phase.
- Discovery, about 3 to 5 days. Goals, audience, an audit of what exists, and a sitemap.
- Design, about 1 to 2 weeks. Layouts for key pages on desktop and mobile, then rounds of feedback.
- Build, about 1 to 2 weeks. The design built in Webflow with CMS, interactions and forms.
- Content and QA, about 3 to 5 days. Copy in place, links and forms tested, SEO checks.
- Launch, 1 day. Redirects live, analytics on, sitemap submitted.
Some phases overlap. These are guides, not promises, and your project gets its own timeline in the quote.
What slows a redesign down
- Late content. The build can start without final copy, but launch cannot.
- Many reviewers. Every extra person adds a round. Name one decision maker.
- Changing scope. New pages mid-project push the date.
- Complex integrations. Each needs setup and testing.
- Surprise content problems. Old pages with broken links or missing images show up late.
Protect your search traffic
A redesign can lose rankings if you are careless. Keep the pages that bring traffic, keep their URLs where you can, and map every old URL to a new one with a 301 redirect. Our redirect map template shows how. Keep titles and headings that already rank unless you have a reason to change them.
Redesign or rebuild on a new platform?
Sometimes the design is fine and the platform is the problem. If edits are slow, plugins keep breaking or speed is poor, a move to Webflow may help. See WordPress to Webflow or the comparison of Webflow vs WordPress.
How to get a redesign done on time
- Write down the goal and how you will measure it.
- Collect copy, logos and photos before kickoff.
- Name one decision maker and set review dates up front.
- Keep a list for "phase two" so good ideas do not derail launch.
- Plan the first month after launch for fixes.
Questions to ask before you start
- What is the one thing the new site must do better than the old one?
- Which pages bring in the most traffic or leads today?
- What do customers say they cannot find?
- Who must approve the design, and by when?
- What is the date we cannot miss?
These answers shape the sitemap and the scope. They are also the basis of a fair quote. If an agency does not ask them, be careful.
Redesign mistakes we see
- Starting with looks. Colours and fonts come after structure and message.
- Cutting content that ranks. Check Search Console before you delete anything.
- Launching without testing. Forms, redirects and tracking each need a check. See our launch checklist.
- No plan for after launch. A site needs small fixes in the first weeks, and regular care after. A landing page or a new section is a quick add when you know the structure well.
- Treating launch as the finish. Plan a review at 30 and 90 days.
How to judge whether the redesign worked
Set the measures before launch, not after. Pick two or three: for example enquiries per month, conversion rate on the main page, and mobile speed. Write down the numbers from the old site. Give the new site 30 and 90 days, then compare. Traffic often dips for a short time after a move, so look at trends rather than the first week.
Also listen. Ask your sales team whether leads feel better informed. Ask customers what they found easy or hard. Quiet signals like these often show problems before the charts do.
Finally, keep improving. A redesign is a strong start, not a finish. The best-performing sites we see are the ones that keep shipping small, steady changes. Plan a few hours or a care plan for this so the work does not stop at launch.
What to do next
Send us your current site and your goal. We will reply with a fixed price and a timeline. Our Webflow development page shows what is included, and our projects come with 30 days of support for safe changes after launch.
More reading: website launch checklist, Webflow developer cost and landing page that converts.
Terms used: Webflow, Core Web Vitals



